KEGIATAN TERIMA RAPORT
DAVA ALVAVA DAN AFRA SALAWA
MENJADI MC DALAM KEGIATAN TERSEBUT
| ANALISIS TINGKAT KERUSAKAN RUANG KELAS | |||||||||
| Nama Madrasah | : MI. NURUL IMAN | ||||||||
| Alamat Lengkap | : Jln. Pulung Kencana | ||||||||
| Kecamatan | : Tulang Bawang Tengah | ||||||||
| Kabupaten | : Tulang Bawang Barat | ||||||||
| No. | Komponen Bangunan | Bobot (%) | Tingkat Kerusakan | ||||||
| Bangunan | Terhadap | Kerusakan | Bobot | Nilai (%) | |||||
| Ruang | Maksimum | (%) | (4x6) | ||||||
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | |||
| 1 | Atap | a. Penutup atap | 10,56% | 100% | 10,56 | 100,00 | 0,1056 | ||
| b. Rangka atap | 11,62% | 100% | 11,62 | 100,00 | |||||
| c. Lisplang dan talang | 2,06% | 100% | 2,06 | 100,00 | |||||
| 2 | Plafon | a. Rangka plafon | 4,67% | 100% | 4,67 | 100,00 | 10,56 | ||
| b. Penutup dan lis plafon | 5,06% | 100% | 5,06 | 100,00 | |||||
| c. Cat | 1,41% | 100% | 1,41 | 100,00 | |||||
| 3 | Dinding | a. Kolom dan balok ring | 9,66% | 100% | 10.000,00 | ||||
| b. Bata/dinding pengisi | 13,68% | 100% | |||||||
| c. Cat | 1,65% | 100% | 1,65 | 100,00 | 51,85 | ||||
| 4 | Pintu dan Jendela | a. Kusen | 2,70% | 100% | 1,40 | 51,85 | |||
| b. Daun pintu | 2,47% | 100% | 2,47 | 100,00 | 51,85185185 | ||||
| c. Daun jendela | 5,15% | 100% | 4,60 | 89,32 | |||||
| 5 | Lantai | a. Struktur bawah | 2,89% | 100% | |||||
| b. Penutup lantai | 8,96% | 100% | 8,96 | 100,00 | |||||
| 6 | Pondasi | a. Pondasi | 11,15% | 100% | |||||
| b. Sloof | 3,30% | 100% | |||||||
| 7 | Utilitas | a. Listrik | 1,79% | 100% | 1,79 | 100,00 | |||
| b. Instalasi air hujan & | 1,22% | 100% | 1,20 | 51,85 | |||||
| pasangan rabat beton | |||||||||
| keliling bangunan | |||||||||
| JUMLAH | 100,00% | 57,45 | |||||||
| NILAI TINGKAT KERUSAKAN | 57,45 | ||||||||
| TINGKAT KERUSAKAN | KESIMPULAN PENGAMATAN | ||||||||
| Ringan | : ≤ 35 % | % Tingkat Kerusakan : | 57,45% | ||||||
| Sedang | : ≥ 35 % - 45 % | Jenis Perawatan : | Rehab | ||||||
| Berat | : ≥ 45 % - 65 % | Luas Bangunan : | 7 x 9 m (63 m2) | ||||||
| Total | : ≥ 65 % | ||||||||
| Mengetahui | |||||||||
| Dinas Pekerjaan Umum | Kasi. Mapemda Tulang Bawang | ||||||||
| Tulang Bawang Barat | |||||||||
| Firmansyah, S.T. | Hj. Eviyana, S.Ag.,M.Pd.I | ||||||||
| NIP:197102022002121009 | NIP: 197307022000122001 | ||||||||
| RENCANA ANGGARAN DAN BIAYA (RAB) | ||||||||
| REHAB GEDUNG, MI. NURUL IMAN | ||||||||
| KABUPATEN TULANG BAWANG BARAT PROPINSI LAMPUNG | ||||||||
| HARGA | ||||||||
| NO. | ITEM PEKERJAAN | SAT. | VOL. | ANALISA | SATUAN | JUMLAH | ||
| (Rp) | (Rp) | |||||||
| I | PEK. PERSIAPAN | |||||||
| 2 | Pasang Bowplang | ls | 1,00 | ls | 500.000,00 | 500.000,00 | ||
| 5 | Papan Proyek | ls | 1,00 | ls | 250.000,00 | 250.000,00 | ||
| 6 | Pek. Bongkaran dan pembersihan | ls | 1,00 | ls | 2.000.000,00 | 2.000.000,00 | ||
| TOTAL PEK. PERSIAPAN | 2.750.000,00 | |||||||
| II | PEKERJAAN DINDING & LANTAI | |||||||
| Beton Praktis | M3 | |||||||
| 1 | a.Sloof 15/20 | M3 | Spl.vc.2 | 2.065.150,00 | - | |||
| 2 | b.Kolom Utama 20/25 | M3 | Spl.vc.2 | 2.065.150,00 | - | |||
| 3 | c.Kolom Selasar 20/20 | M3 | 0,25 | Spl.vc.2 | 2.065.150,00 | 516.287,50 | ||
| 4 | d.Kolom Praktis 15/15 | M3 | 0,24 | Spl.vc.2 | 2.065.150,00 | 495.636,00 | ||
| 5 | e.Ring Balk 15/15 | M3 | 0,25 | Spl.vc.2 | 2.065.150,00 | 516.287,50 | ||
| 6 | f. Ring Balk 15/20 | M3 | Spl.vc.2 | 2.065.150,00 | - | |||
| 7 | g. Konsol 15/20 | M3 | Spl.vc.2 | 2.065.150,00 | - | |||
| 8 | h. Balok Latai | M3 | Spl.vc.3 | 2.065.150,00 | - | |||
| 9 | Rabat Beton | M2 | Spl.va | 1.121.900,00 | - | |||
| 10 | Dinding 1/2 bata 1 : 4 | M2 | G.33 | 836.690,00 | - | |||
| 11 | Plesteran 1:4 & acian | M2 | 147,66 | G.50q | 26.075,00 | 3.850.123,52 | ||
| 12 | Pengecatan dinding | M2 | 147,66 | G.53.a | 207.435,00 | 30.628.969,26 | ||
| Pekerjaan Lantai | ||||||||
| 13 | a.Urugan Tanah | M3 | 8,24 | A.16.a | 56.000,00 | 461.440,00 | ||
| 14 | b.Lantai Kerja | M2 | 63,00 | G.67 | 52.995,00 | 3.338.685,00 | ||
| 15 | c.Pasang Lantai Keramik 30/30 | M2 | 63,00 | G.69 | 95.405,80 | 6.010.565,40 | ||
| 16 | d.Plint Keramik 10x30 | M1 | 28,73 | G.78 | 6.356,31 | 182.638,09 | ||
| SUB TOTAL (II). PEKERJAAN DINDING & LANTAI | 46.000.632,27 | |||||||
| III | PEKERJAAN ATAP | |||||||
| 1 | Kuda-kuda | M3 | 1,25 | F.22 | 4.570.000,00 | 5.712.500,00 | ||
| 2 | Gording | M3 | 0,25 | F.22.a | 3.535.000,00 | 883.750,00 | ||
| 3 | Penutup Atap (genteng) | M2 | 99,01 | F.16 | 23.053,25 | 2.282.440,81 | ||
| 4 | Karpusan bubungan genteng | M1 | 9,00 | H.6 | 66.192,40 | 595.731,60 | ||
| 5 | Papan lisplank 3/30 | M1 | 23,94 | F.21 | 129.100,00 | 3.090.998,27 | ||
| 6 | Pengecatan lisplank & Konsul | M2 | 7,18 | Spl.9.a | 32.543,20 | 233.751,30 | ||
| SUB TOTAL (III). PEKERJAAN ATAP | 12.799.171,97 | |||||||
| IV | PEKERJAAN PLAFOND | |||||||
| 1 | Pek. Plafond | M2 | 63,00 | F.39 | 160.150,00 | 10.089.450,00 | ||
| 3 | List Plafond | M1 | 94,50 | ls | 6.500,00 | 614.276,00 | ||
| 4 | Pengecatan plafond | M2 | 63,00 | G.53.a | 207.435,00 | 13.068.405,00 | ||
| SUB TOTAL (IV). PEKERJAAN PLAFOND | 23.772.131,00 | |||||||
| V | PEKERJAAN KUSEN & PARTISI | |||||||
| 1 | Pas. Kunci tanam 2 kali putar | set | 1,00 | Ls | 160.000,00 | 160.000,00 | ||
| Pas. Engsel pintu | bh | 3,00 | Ls | 20.000,00 | 60.000,00 | |||
| Pas. Engsel jendela | bh | 30,00 | Ls | 10.000,00 | 300.000,00 | |||
| Pas. Grendel Jendela | bh | 15,00 | Ls | 8.000,00 | 120.000,00 | |||
| Pas. Grendel Pintu | bh | 2,00 | Ls | 8.000,00 | 16.000,00 | |||
| Pas. Hak angin | bh | 30,00 | Ls | 7.000,00 | 210.000,00 | |||
| Pas. Tarikan jendela | bh | 15,00 | Ls | 8.000,00 | 120.000,00 | |||
| Pek. Tralis besi | M2 | Ls | 142.000,00 | - | ||||
| 2 | Kusen & pintu type P1 | Unit | 0,25 | F.27 | 5.275.000,00 | 1.318.750,00 | ||
| 3 | Kusen & Jendela J2 | Unit | 0,25 | F.27 | 5.275.000,00 | 1.318.750,00 | ||
| 4 | Lubang Angin | m2 | 2,33 | F.27.a | 190.750,00 | 445.083,33 | ||
| 5 | Pengecatan kusen, pintu dan jendela | M2 | 0,27 | Spl.9.a | 32.543,20 | 8.678,19 | ||
| SUB TOTAL (V). PEK. KUSEN & PARTISI | 4.077.261,52 | |||||||
| VI | PEKERJAAN UTILITAS | |||||||
| 1 | Titik Lampu | titik | 4,00 | Ls | 45.000,00 | 180.000,00 | ||
| 2 | Titik Stopkontak | titik | 1,00 | Ls | 35.000,00 | 35.000,00 | ||
| 3 | Saklar ganda | buah | 2,00 | Ls | 35.000,00 | 70.000,00 | ||
| 4 | Stop Kontak | buah | 1,00 | Ls | 30.000,00 | 30.000,00 | ||
| 5 | Lampu TL 2 x 40 Watt Lengkap | unit | 4,00 | Ls | 40.000,00 | 160.000,00 | ||
| 6 | Saluran keliling bangunan | M1 | 20,00 | G.81 | 96.781,00 | 1.935.620,00 | ||
| SUB TOTAL (VI). PEKERJAAN UTILITAS | 2.410.620,00 | |||||||
| TOTAL PEK. REHAB GEDUNG 1 RUANG KELAS | 91.809.816,77 | |||||||
| Mengetahui | ||||||||
| Dinas Pekerjaan Umum | Kasi. Mapemda Tulang Bawang | |||||||
| Tulang Bawang Barat | ||||||||
| Firmansyah, S.T. | Hj. Eviyana, S.Ag.,M.Pd.I | |||||||
| NIP:197102022002121009 | NIP: 197307022000122001 | |||||||